Floresta Corridor Master Plan

Print
Press Enter to show all options, press Tab go to next option

Floresta Corridor Master Plan

Southbend to Prima Vista

Improvements to the Floresta Drive corridor are a priority for the City Council, and at the 2017 Summer Retreat, Council directed staff to model the corridor from a traffic standpoint for both a 2-lane and 4-lane roadway section. The new modeling was performed, and it included the new Crosstown Parkway Extension Project connection to U.S. Highway 1 at Village Green Drive, for the projected traffic volumes in the year 2037. The results/ recommendations were presented to City Council on Oct. 31, 2017 for consideration. From the results of the new modeling, staff and the consultant have prepared a Conceptual Improvement Plan for the Floresta Drive Corridor from Southbend to Prima Vista Boulevard.

Goals for the Corridor
  • Accommodate projected traffic volumes while minimizing impacts to adjacent properties and neighborhoods
  • Provide improvements to the corridor that facilitate safe and efficient flow of traffic and minimize points of conflict
  • Preserve the residential nature of the corridor
  • Strengthen a sense of neighborhood along the corridor through implementation of a Complete Street Concept
  • Enhance pedestrian and bicycle movements and strengthen their connections to the school
  • Introduce landscaping and lighting schemes that are in harmony with the community
  • Meet Goal 5 of the City of Port St Lucie Strategic plan, “High Quality Infrastructure and Facilities”
Segment 1A
Segment1A
Segment 1B
Segment1B
Segment 2A
Segment2A
Segment 2B
Segment2B
Segment 3A
Segment3A
Segment 3B
Segment3B

Construction Plans for Wawa on Prima Vista Blvd.

Address: 264 NE Prima Vista Blvd, Port St Lucie, FL 34983

The new Wawa will be located on the SW corner of Prima Vista Blvd. and Floresta Dr.