The Engineer of Record (EOR) is responsible for directing the contractor in the course of the work to be owned and maintained by PSLUSD. Temporary water usage will be billed to the permittee according to City Code.
Temporary Water Meter Permit Application
Temporary Access and Construction Easement form
The forms below should be used to document the required inspections and are to be signed by the EOR or his designee for submittal to PSLUSD.
Inspection and Testing Summary
Disinfection Test Results Report
Wire Continuity and Electronic Marker Verification Test Report
Pump Station Start Up Test Report
Backflow Prevention Assembly Test Report
Final Inspection Report—Deficiency List
Inspection Package (all forms)
The PSLUSD will schedule the Final Inspection for seven (7) calendar days after receipt of a complete Final Inspection Request Package. This package should be reviewed with PSLUSD staff at a scheduled meeting to ensure that the package is complete. The meeting is not to address whether the individual items in the package are satisfactory, only that all required items are in the package. The package will be reviewed in the seven (7) calendar days prior to the Final Inspection. A passing Final Inspection requires that the entire package and the field inspection BOTH have no deficiencies.
Final Inspection Package Checklist