PSL monitors stormwater system ahead of heavy rain forecast

Published on November 17, 2026

storm rain cloud

The City of Port St. Lucie is continuing preparations for the anticipated rain event forecast for the region.

Since Sunday, crews have lowered stormwater basin levels to create capacity for additional rainfall. Staff is clearing storm drains, monitoring water levels and conducting pre-storm inspections of swales, culverts, drains, canals and related infrastructure throughout the City.

All systems are being monitored and operated in accordance with the South Florida Water Management District (SFWMD) permits.

Staff will remain on call throughout the rain event over the next several days, ready to deploy quickly as needed.

The Public Works Department is coordinating with regional partners, including St. Lucie County, the South Florida Water Management District, community development districts (CDDs) within the City and Martin County. Barricades are staged throughout the City for potential road closures and cold-patch material is available for pothole repairs.

The City's Road Closure Map will updated throughout the storm event.

  • Blackwell Pump Station (located at St. Lucie/Martin county border west of Green River Parkway): The City has not operated the Blackwell pump since turning it off Nov. 3.

  • Tiffany Pump Station (located on Tiffany Avenue, east of Lennard Road): The City is using this station to reduce reliance on the Blackwell Pump Station to discharge stormwater. The Tiffany Pump Station sends water to the Hog Pen Slough canal, which discharges to the St. Lucie River.

  • Tradition and Southern Grove: Because community roads and stormwater systems are privately maintained, HOAs and CDDs are responsible for lowering lake levels, staging pumps, operating manual gates and inspecting private streets. Residents should contact their HOA or CDD directly for the latest information on local conditions and response efforts. During the rain event in early November, the City assisted with acquiring multiple pumps and pipe rentals to help move water away from affected communities. The City remains in constant coordination with the CDDs and will support emergency response operations, as needed.

  • California and Savona boulevards and Darwin Boulevard near the Sawgrass Lakes community: Teams are monitoring water levels at these intersections. Water-level sensors are in place to provide ongoing alerts that will allow staff to respond quickly, and barricades are staged nearby if water levels rise. The traffic signal also is being closely monitored, and staff is prepared to respond, if needed.

  • Active construction projects: The City has contacted all contractors and engineering firms overseeing active City projects and directed them to prepare job sites for the rain event. Additionally, the City also has contacted all active private development construction projects to have them prepare job sites for this rain event.

The City urges residents to use caution. When the ground becomes saturated, extra rainfall could lead to water temporarily pooling on roadways. During these conditions, we urge residents to exercise caution while driving and walking, as some streets, sidewalks and intersections could experience ponding. If possible, please avoid these areas during periods of extreme rainfall.

Stay safe and report flood damage

Residents are encouraged to sign up for emergency weather alerts at www.stlucieco.gov/alert to receive the latest updates.

If floodwater entered your home but you are not in immediate danger, report the damage to 1PSL by calling 772-871-1775 and selecting option 3. Reporting storm damage helps the City document impacts and support potential FEMA disaster assistance requests. Please note that reporting damage does not replace filing an insurance claim.

Read more about flood mitigation and insurance