When did construction begin?
Construction began September 2026.
What should I expect during construction? You may notice:
- Heavy equipment and/or increased truck traffic.
- Some noise and vibration from heavy equipment.
What will the well site look like during construction?
- A drill rig approximately 130 feet tall will be used for the below-grade portion of the well.
- Additional equipment may include water and slurry tanks, cement and slaker trucks, cranes and other support vehicles.
How long will the entire project last?
The full project is expected to continue through 2029.
Will I still have access to my property?
Yes. All work will take place in public areas. There are no plans to work near homes or private property.
Will my water service be interrupted?
No. Your water service will not be affected during this project.
What will the Class I injection wells inject?
The City is constructing a reverse-osmosis (R.O.) treatment plant. The R.O. treatment plant will treat brackish water withdrawn from the Floridan Aquifer to produce drinkable water. The byproduct of the potable-water treatment process, primarily a concentrated brackish water, will be injected into the injection wells.
Are the injection wells a risk to Florida's drinking water?
No. The Florida Department of Environmental Protection (FDEP) regulations require injection wells to be drilled thousands of feet below the lowermost underground sources of drinking water. They rely on deep, confined rock formations and multiple protective layers of casing and cement to ensure no injected fluid mixes with fresh drinking water aquifers.
How are the injection wells monitored?
FDEP strictly enforces the Underground Injection Control Program. Well operators must utilize continuous on-site monitoring, perform daily reporting of physical properties and flow rates, and conduct continuous checks of well pressures to detect potential leaks.
Who can I contact with questions?
Contact the project team at 772-304-0495 or info@themerchantstrategy.com.